Miri Bypass Bridge
Primary tabs

Miri Bypass Bridge is a bridge linking Permy directly to the Miri Bypass Road to Eastwood Industrial Area, Eastwood Golf Club, Miri Airport, or Taman Tunku and the inner northern part of Miri. The bridge was completed November 2014 and cut approximately 10 minutes of travel time from Permy area to Airport area simply by bypassing the rest of Miri via this route over the Miri River.
In 2019, a second bridge structure alonside the first one was constructed to facilitate a dual-lane upgrade along the Pan-Borneo highway. This construction was beset with problems as after construction the second bridge collapsed due to a construction defect with the girder beams, injuring two construciton workers performing welding. The bridge was eventually rebuilt, reinforced and became fully operational by 2022.
The Miri Bypass Bridge is a significant component in the city's transportation infrastructure, providing an alternative route and easing traffic congestion, and increasing efficiency and mobility in the region. The bridge also plays a role in the providing easy access to industrial areas, airport, and is the major link for the Pan-Borneo Highway link across the inner Miri River.
Highstreet Chinese New Year Market (also known as Gong Xi Bazaar) is an annual event that takes place about a week before the celebration of the Chinese New Year eve. Highstreet Roads are closed off during this week to set up stalls during day, with a section of Kingsway closed at night for the event.
The Taman Tunku Water Tower is located within Taman Tunku residential area
Photos of Kingsway Road, 1950s and in 2006.
Miri Plaza was originally a shopping mall at Pelita Commercial Center that is four stories tall, built in the early 1990s. Its anchor tenant was Metropolitan Department Store & Supermarket.